Below the Project Summary on the Project Overview page, you will find several data tables that break down issue distribution by various criteria. These tables offer a quick and structured view of project performance across teams, inspectors, and work categories.
The following tables are displayed:
-
Issues by Assigned Team
Groups issues based on the team they are assigned to. -
Issues by Category
Organizes issues by their defined work category (e.g., HVAC, Civil, Architectural). -
Issues by Raised Inspector
Displays the number of issues logged by each inspector. -
Issues by Plan Group
Groups issues based on the plan group they are associated with (e.g., Level 1, Podium, Roof). -
Issues by IR (Inspection Request)
Shows issue counts attached to specific IRs. -
Issues by IR Status
Categorizes issues based on the current IR workflow status (e.g., Consultant Snagging, QA De-snagging, Rejected, etc.). -
Issues by Plans
Breaks down issues according to the individual plan sheets they belong to.
These tables provide a quick overview of issue counts based on team, plan, category, and inspector. Each number in the tables acts as a direct link to the Reporting Page, where the data is automatically filtered by the selected category.
For example, clicking on the "Electrical" team with the status "Fixed" will redirect you to the Reporting Page, showing only issues assigned to the Electrical team with the Fixed status.
0 Comments